Submission to circular recovery

How the E-Waste Nodal Centre Works

A coordinated pathway connecting e-waste generators, collection partners, transporters, sorting hubs, repair facilities, authorized recyclers and recovered-material users.

The operating pathway

Five stages with clear responsibilities and records

Electronic waste should not move through undocumented or unsafe channels. The platform records the source, quantity, condition, movement and verified final route of registered products.

01
Citizens, institutions, SHGs and NGOs

Registration & Collection

Products are registered through individual submissions, bulk institutional requests, collection drives or approved collection points.

OutputUnique submission number and digital acknowledgement.
02
Registered MSMEs and logistics partners

Transport & Aggregation

Approved partners collect, provisionally record or weigh, and move products to a designated hub with handover details.

OutputDocumented collection and custody record.
03
Technical hubs, MSMEs and trained staff

Inspection, Sorting & Pre-processing

Products are inspected and classified for reuse, repair, refurbishment, component recovery, recycling or specialized handling.

OutputVerified product classification and processing route.
04
Verified repair partners and authorized recyclers

Repair, Refurbishment or Recycling

Products with remaining value are repaired or refurbished. Non-repairable items are transferred for controlled dismantling and recovery.

OutputRepair outcome, refurbishment record or recycling record.
05
Manufacturers, institutions, research and EPR channels

Circular Reintegration

Approved reusable products and verified recovered materials return to productive use through suitable circular channels.

OutputFinal completion record and applicable certificate.

Citizen and institution journey

A simple digital experience backed by technical verification

1Fill the form

Add contact, product, condition and collection information.

2Receive a submission ID

Download an acknowledgement and retain the reference number.

3Pickup or drop-off

Receive approved instructions after the request is reviewed.

4Technical inspection

The Hub validates condition and selects the final pathway.

5Processing

The item is reused, repaired, refurbished, recovered or recycled.

6Certificate and impact

Verified completion, materials and impact records appear in the dashboard.

Example status timeline

EWNC/2026/00145

Request Submitted

Product and collection details received

Request Reviewed

Initial information verified
3

Pickup Scheduled

Collection date and partner assigned
4

Hub Inspection

Condition and route awaiting validation
5

Processing

Reuse, repair, refurbishment or recycling
6

Completed

Final record or certificate issued
Track a Submission

3R decision support

Safety first, then value retention, then material recovery

The pilot 3R model supports preliminary triage. The final route is verified by trained personnel.

Reuse / Life Extension

Continue use, donate, transfer or refurbish a functional product before treating it as waste.

🔧

Repair / Refurbish

Prioritize repair when technical feasibility, parts, product age, safety and economics are favourable.

Authorized Recycling

Route unsafe, severely damaged or end-of-life products to controlled dismantling and recovery.

Safety notice

Do not dismantle hazardous products before submission

Damaged batteries, burnt equipment, broken CRT equipment, exposed live parts and chemically contaminated products require specialized handling.

Do not puncture, crush or heat batteries.Do not burn cables, circuit boards or plastic housings.Do not mix electronic waste with ordinary household waste.Clearly disclose fire, battery, chemical or electrical hazards in the form.Wait for approved collection or drop-off instructions.
Hazard reporting is mandatory

The 3R safety gate automatically flags critical hazards for manual review and controlled downstream handling.